Getting it Done for July

I’m back from vacation, sort of recovered. If you want to see what we were up to, I posted all our adventures over at this blog. I wanted our family to be able to follow along on our trip.

I did visit a few quilt shops in Alaska and came home with two kits and two half-yard Alaska themed Batiks.

photo photo1

 

 

 

Here’s a link to the table runner kit/pattern. Only the kit I got includes a purple Fusions 7 (my favorite fabric ever) as the background and one of the rings. But the rest is pretty much the same color scheme.

http://quiltswithatwist.com/store/details.php?prodId=58&category=&secondary=&keywords=rainforest%20rings

Here’s the wall hanging that Darby insisted I make:

http://www.northernthreads.net/p-21302-northern-lights-pattern.aspx

So back to reality. Here’s what I hope to get done in July:

1. Finish the Caroler Table Runner. My UFO number 8 for this month.

2. Pull fabrics for my Shipsie project. Muffet has challenged me since she has her fabrics pulled already.

3.  Quilt Monster Bash

4. Bind Christmas Quilt that I just finished hand quilting.

I think I can accomplish a lot more than these four things, but these are a good start.

Linking up to Judy’s Getting It Done post.

One thought on “Getting it Done for July

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s